Favorites ()

Recent Searches

loading

Sulphur, LA

Order: 22222
Temp
Position Details Be able to perform suction and discharge line break from pump. Unbolt and remove pump and motor. Once foundation is there, install pump to suction with owner provided nuts and gasket. Install motor and coupling and perform pre alignment. Install Discharge gasket and bolt up to flange. Be able to torque bolts. When asked, be able to perform final alignment. Client to provide Starrett Jig and Digital alignment device. Be able to fill out QA/QC forms as needed. Must have TWIC and Safety Card Must have valid driver license Must have 3-years of verifiable experience Must be willing to travel on occasion Project length - 4-6-months